Customization: | Available |
---|---|
Application: | Hardware Spraying Equipment |
Power Source: | Electric |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LEIXIN Powder Coating Production Line Electrophoresis Line Spray Painting Line
Technical parameter
Voltage | 1P220VAC | Touch screen | Delta PLC |
Power | 500W | ||
Air Pressure | 0.6-0.8MP | Cylinder | AirTAC (Taiwan) |
Powder Level Detector | Omron | The Electromagnetic Valve | AirTAC (Taiwan) |
The control is divided into manual and automatic operation. The wiring in the cabinet is made according to the standard. |
Features of the whole machine
Toner supply center for quick color change
The exhaust system is connected with the large cyclone and spray booth, and the exhaust system with the large cyclone has an automatic butterfly valve;
The roof of the powder supply center includes lighting;
1 set of powder local fluidization system, which can directly pump powder from the powder box of the powder supplier;
2 sets of powder supply barrels (with fluidization), volume 140 liters;
Vibrating platform for powder box;
Pneumatic piston lifting device for Venturi powder pump and powder suction pipe;
The piston that clamps the compact;
Automatic air blowing cleaning device for powder suction pipe and powder pump;
advantage
One: Powder fluidization is smoother
Two: the effect of maintaining a good working environment
Three: make the powder supply of the spray gun more uniform
Four: completely liberate the operator, no longer troubled by the powder supply problem of the spray gun
Five: greatly reduce the labor intensity of the operators during the cleaning process and the impact of dust on the health of the operators
Six: Make color changing simple and convenient
Click on the text in the table to view more products
Recommended Products | ||
Powder coating production line | Electrophoretic coating production line | Water curtain spray painting line |
Spray pre-treatment equipment | Combined drying oven | Cyclone secondary recovery |
Stainless steel powder room | PP board plastic powder room | Oven |
Question 1: Are you a trader or a factory?
We are manufacturer and exporter.
Question 2: If we want to consult about powder coating production line, what should I provide?
A. Maximum size and weight of workpiece (length, width, height and kg).
B. What is the expected output in one day? (One day = 8 hours)
C. What heating power do you prefer: electricity, gas, diesel or coal?
D. The site area of your factory (length, width and height)
E. Is pre-treatment required?
Question 3: How is the product quality of your factory?
Our factory has passed the IS090001 quality management system certification. The quality of all materials is in line with national standards. There are dedicated personnel to control the quality during the production process. You can rest assured about the quality of the product.
Question 4: How is your after-sales service?
All the main parts of our coating production line are under warranty for one year. If the product is damaged by human factors or force majeure, the consumable parts are not covered by the warranty. One-time purchase, lifelong maintenance, response within 12 hours, and solution within 24 hours. The cost of technicians going abroad for installation, commissioning and after-sales service shall be borne by the buyer.
Question 5: What are your payment terms?
We accept payment by T/T, 30% deposit is required before production, and the remaining 70% is required before delivery. We will provide photos and videos of the products before you clear the final payment.