Customization: | Available |
---|---|
Type: | Automatic Powder Coating Booth |
Operation Type: | Fully Automatic/Semi-Automatic/Manual |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Specifications | ||
Spray Pre-treatment Equipment | Normal Temperature Section Shed | Normal temperature section shed and transition section |
Pre-Degreasing Water Tank | 304 stainless steel water tank, horizontal centrifugal pump Q=40~45m3/h, H=16~20m, power=4.0KW |
|
Main Skim Water Tank | ||
Silane Water Tank | ||
Pure Water Washing Tank 1-4 | ||
Automatic Water Blowing System | Exhaust chamber: 4-72 5A 4KW including exhaust pipe Nylon brush |
|
Water Supply And Drainage Pipeline | 1-inch water supply pipeline and manual + automatic valves. 5-inch drainage pipeline and valves. | |
Combined Drying Oven | Moisture Drying Oven | Bridge type, inner wall plate galvanized sheet |
Powder Curing Oven | ||
Water Trying Furnace Thermal Energy System | 300,000 kcal thermal energy system (stainless steel thermal energy liner) | |
Curing Oven Thermal System | 1 million kcal thermal energy system (stainless steel thermal energy liner) | |
Natural Gas Alarm Device | ||
Powder Spraying Equipment | Large Cyclone Double Stage Recycling Powder Room | Total air extraction volume 24000m³/h, 45kw PP chamber large cyclone recovery system |
Advanced Reciprocating Lift | Spraying height 2500mm, 1.5kw, 6 guns per side | |
Powder Supply Center | Provide powder for powder room use | |
Spray Gun | Manual/automatic powder spraying equipment use | |
Explosion-Proof System | ||
Transport System | Suspension Conveyor Chain | Choose customization based on product quality |
Conveyor Track | ||
Drive System | Customized drive system with torque clutch | |
Tensioning Device | Roller row gravity tensioning system | |
Electrical Control System | Control System | PLC, touch screen control system |
Information Management System Dashboard | Remote large screen information display system signboard |
Click on the text in the table to view more products
Recommended Products | ||
Powder coating production line | Electrophoretic coating production line | Water curtain spray painting line |
Spray pre-treatment equipment | Combined drying oven | Cyclone secondary recovery |
Stainless steel powder room | PP board plastic powder room | Oven |
Question 1: Are you a trader or a factory?
We are manufacturer and exporter.
Question 2: If we want to consult about powder coating production line, what should I provide?
A. Maximum size and weight of workpiece (length, width, height and kg).
B. What is the expected output in one day? (One day = 8 hours)
C. What heating power do you prefer: electricity, gas, diesel or coal?
D. The site area of your factory (length, width and height)
E. Is pre-treatment required?
Question 3: How is the product quality of your factory?
Our factory has passed the IS090001 quality management system certification. The quality of all materials is in line with national standards. There are dedicated personnel to control the quality during the production process. You can rest assured about the quality of the product.
Question 4: How is your after-sales service?
All the main parts of our coating production line are under warranty for one year. If the product is damaged by human factors or force majeure, the consumable parts are not covered by the warranty. One-time purchase, lifelong maintenance, response within 12 hours, and solution within 24 hours. The cost of technicians going abroad for installation, commissioning and after-sales service shall be borne by the buyer.
Question 5: What are your payment terms?
We accept payment by T/T, 30% deposit is required before production, and the remaining 70% is required before delivery. We will provide photos and videos of the products before you clear the final payment.