Customization: | Available |
---|---|
Application: | Hardware Spraying Equipment |
Power Source: | Electric |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
LEIXIN Powder Coating Production Line Electrophoresis Line Spray Painting Line
Features of the whole machine
Automatic current control device "standard Voltang" (kv) This device can automatically adjust and control the current and voltage, so that the powder penetrates deep into the workpiece surface. Get the best possible coating quality.
When the spray gun is close to work, the current and voltage are automatically adjusted, usually flat workpieces require high voltage, and when spraying concave workpieces, low voltage is required to allow the powder to penetrate into the recesses of the workpiece.
The high voltage module is close to the nozzle, the voltage loss is low, and the replaceable high voltage components bring convenience to maintenance.
The design of the two-way central gas makes the pole for the diversion liquid no longer accumulate powder, which enhances the discharge effect and improves the powder application rate.
Click on the text in the table to view more products
Recommended Products | ||
Powder coating production line | Electrophoretic coating production line | Water curtain spray painting line |
Spray pre-treatment equipment | Combined drying oven | Cyclone secondary recovery |
Stainless steel powder room | PP board plastic powder room | Oven |
Question 1: Are you a trader or a factory?
We are manufacturer and exporter.
Question 2: If we want to consult about powder coating production line, what should I provide?
A. Maximum size and weight of workpiece (length, width, height and kg).
B. What is the expected output in one day? (One day = 8 hours)
C. What heating power do you prefer: electricity, gas, diesel or coal?
D. The site area of your factory (length, width and height)
E. Is pre-treatment required?
Question 3: How is the product quality of your factory?
Our factory has passed the IS090001 quality management system certification. The quality of all materials is in line with national standards. There are dedicated personnel to control the quality during the production process. You can rest assured about the quality of the product.
Question 4: How is your after-sales service?
All the main parts of our coating production line are under warranty for one year. If the product is damaged by human factors or force majeure, the consumable parts are not covered by the warranty. One-time purchase, lifelong maintenance, response within 12 hours, and solution within 24 hours. The cost of technicians going abroad for installation, commissioning and after-sales service shall be borne by the buyer.
Question 5: What are your payment terms?
We accept payment by T/T, 30% deposit is required before production, and the remaining 70% is required before delivery. We will provide photos and videos of the products before you clear the final payment.